Oh and also, not worth mentioning, but the mange posted a very tiny printed manager's report on some slime-green colored paper, then stuck it way up at the top of both bulletin boards; I guess she doesn't want anyone reading her report. Never seen print that tiny before on her reports; geez, these are old people in here w/bad sight for heaven's sake!
Obviously, mange did this on purpose because of some axe she has to continue to grind with the residents.
A real puta!
Obviously, mange did this on purpose because of some axe she has to continue to grind with the residents.
A real puta!
Manager's Report
Board Meeting 02-19-14
Projects in the works:
Storm drain boxes on the lakefront. 2 are done. Two more will be completed this month.
SWFWMD Water Use Permit renewal. D FrB has been contracted to complete the application and submit the renewal request for the new permit with SWFWMD. David and I have already attended the pre-application meeting with SWFWMD and David is continuing to gather the data required to process.
Replacing the sign at SR60. The Sign Committee is reviewing the suggestions submitted and
the survey of the parcel of land at SR60 where the SLR sign is located which was completed last week.
The tennis court repairs have been halted to re-access new damage happening over night due to an abundance of mushroom growth. Management is acquiring bids to address replacing the courts for the Board's review in the coming fiscal year. In the mean time tennis players are relegated to playing on court 3 only. Thanks so much to the residents for their patience.
Deee & Deee Tree will be in today to remove a dead tree and do some trimming.
C U Tm Bill will be replacing bumpers on one pool table and the felt covers on 2 pool tables on Sunday, February 23. The Pool Players will be paying for ½ of the repair invoice. Thanks so much to the Pool Players for their donation!
Future projects:
Sewer main and service lateral repairs. The camera work information has been sent out to a 3rd bidder on the project. The repairs are set to begin in the spring of the 2014-2015 fiscal year.
Repair of the rear wall of the recreation building in the 2014-2015 fiscal year.
Repair of the fence surrounding the Resort and the tennis courts in the 2014-2015 fiscal yr.
Rehabilitation of the interior of the north waste plant in the 2014-2015 fiscal year.
Maintenance items:
The interior automatic door button for Memorial H all has been installed and is now operational.
A new 2 way radio call box to connect with security officers has been purchased to install in Memorial H all, replacing the one which was in the old annex and was transferred to the office after the office call box could no longer be repaired.
Also, the risers on the steps to Memorial H all have been painted caution yellow for safety.
Sxxxxxxxx Exxxxxxx has installed 2 more lights for better visibility in front of the clubhouse and near the entrance of the over flow parking lot.
Maintenance made repairs to the 3 and 4 inch sewer lines which run from the blower motor room to the waste plant.
Housekeeping items:
We still have a list of people waiting for recycle bins. We hope to have those orders filled by the end of the week. Thank you for your patience as always.
Your latest reconciled financials are available at the office for your records.
On behalf of Sxxxxxxxx Ixx Inc., I would like to thank the Board and the Association for the opportunity to serve the needs of the community this past year and look forward to our continued mutually respectful and fulfilling working relationship.
I would also like to thank the sound engineer , without whom we could not have our meetings.
Respectfully, M K (LCAM) for SLohA
Board Meeting 02-19-14
Projects in the works:
Storm drain boxes on the lakefront. 2 are done. Two more will be completed this month.
SWFWMD Water Use Permit renewal. D FrB has been contracted to complete the application and submit the renewal request for the new permit with SWFWMD. David and I have already attended the pre-application meeting with SWFWMD and David is continuing to gather the data required to process.
Replacing the sign at SR60. The Sign Committee is reviewing the suggestions submitted and
the survey of the parcel of land at SR60 where the SLR sign is located which was completed last week.
The tennis court repairs have been halted to re-access new damage happening over night due to an abundance of mushroom growth. Management is acquiring bids to address replacing the courts for the Board's review in the coming fiscal year. In the mean time tennis players are relegated to playing on court 3 only. Thanks so much to the residents for their patience.
Deee & Deee Tree will be in today to remove a dead tree and do some trimming.
C U Tm Bill will be replacing bumpers on one pool table and the felt covers on 2 pool tables on Sunday, February 23. The Pool Players will be paying for ½ of the repair invoice. Thanks so much to the Pool Players for their donation!
Future projects:
Sewer main and service lateral repairs. The camera work information has been sent out to a 3rd bidder on the project. The repairs are set to begin in the spring of the 2014-2015 fiscal year.
Repair of the rear wall of the recreation building in the 2014-2015 fiscal year.
Repair of the fence surrounding the Resort and the tennis courts in the 2014-2015 fiscal yr.
Rehabilitation of the interior of the north waste plant in the 2014-2015 fiscal year.
Maintenance items:
The interior automatic door button for Memorial H all has been installed and is now operational.
A new 2 way radio call box to connect with security officers has been purchased to install in Memorial H all, replacing the one which was in the old annex and was transferred to the office after the office call box could no longer be repaired.
Also, the risers on the steps to Memorial H all have been painted caution yellow for safety.
Sxxxxxxxx Exxxxxxx has installed 2 more lights for better visibility in front of the clubhouse and near the entrance of the over flow parking lot.
Maintenance made repairs to the 3 and 4 inch sewer lines which run from the blower motor room to the waste plant.
Housekeeping items:
We still have a list of people waiting for recycle bins. We hope to have those orders filled by the end of the week. Thank you for your patience as always.
Your latest reconciled financials are available at the office for your records.
On behalf of Sxxxxxxxx Ixx Inc., I would like to thank the Board and the Association for the opportunity to serve the needs of the community this past year and look forward to our continued mutually respectful and fulfilling working relationship.
I would also like to thank the sound engineer , without whom we could not have our meetings.
Respectfully, M K (LCAM) for SLohA