Post by Admin on Apr 18, 2014 6:52:47 GMT -5
This is the one that is gonna cost Big Bucks! Here is the layout of the camera work done and where the first phase of repairs will be done. Use saddleviewer/123abc to enlarge or download. (You can only see the thumbnail while in Guest status). Attachment DeletedAttachment DeletedThank you to JAX2 (Judi and Jm) for putting together this graphic depiction of a very complicated project. It took time and great attention to details.
|
|
Deleted
Deleted Member
Posts: 0
|
Post by Deleted on Apr 18, 2014 7:46:41 GMT -5
With a proper thinking Management Company the Sewer Laterals would have been done BEFORE the paving. No one should believe that these breaks and blockages occurred AFTER the poor pave over done by T-ucker.
Always the cart before the Horse and get-r-wrong the first time. Give yourselves a big slap on the back manbod for wasting every ones time and money once again!
|
|
|
Post by Curious George on May 23, 2014 6:20:18 GMT -5
This is the one that is gonna cost Big Bucks! Here is the layout of the camera work done and where the first phase of repairs will be done. Use saddleviewer/123abc to enlarge or download. (You can only see the thumbnail while in Guest status). Thank you to JAX2 (Judi and Jm) for putting together this graphic depiction of a very complicated project. It took time and great attention to details. Does anyone know the status of the repairs to be made to sewer laterals? I Hayvn't seen any pre-excavation markings on the pavement for cuts yet. I hope this work isn't scheduled for when we have our rainy season, if we have sewer pipes that are leaking now what is the delay? It was imperative that the budget pass to have the money to fix the problem but there doesn't seem to be the same urgency to actually do the work. Makes you wonder if this big dig will start when folks start returning in the fall.
|
|
|
Post by Dick Tracy on Jul 2, 2014 17:24:28 GMT -5
Manager_Report Date: 07/02/2014 Seq: 1
ATTENTION RESIDENTS!
LMK PIPE RENEWAL WILL BEGIN WORK ON THE SEWER LATERALS ON JULY 7, 2014 ON
S-bag TRAIL
AT THE FOLLOWING ADDRESSES:
July 7: 14, 41, 51, 70
July 8: 37, 58, 62
July 9: 29, 38, 42, 33
July 10: 21, 24, 27, 30
July 11: 15, 19, 22, 26
If you plan to be in residence on those days, please turn your water off at the meter while repairs are being performed. We appreciate your cooperation during this project
Manager_Report Date: 07/02/2014
|
|
|
Post by Mr. Obvious on Jul 2, 2014 18:22:39 GMT -5
Didn't we just pay for a mapping of all water key boxes? Why wouldn't the water mains be shut of with the isolator valves on the street? That's how its done in the real world, maybe with each unit doing this it may instill a "neighbor helping neighbor" movement!
|
|
|
Post by Dick Tracy on Jul 3, 2014 12:37:44 GMT -5
The Contractor (in his uniform) should knock on the residents door and inform them they will be working on their sewer lateral today, and we will have to cutoff your water supply at your water meter. We will notify you when the repair is complete, and we will also turn your water supply back on when we are finish.
The resident should not have to be involved in the repair process. The advance notice is great, if the repairs stay on schedule.
|
|
|
Post by Dick Tracy on Jul 11, 2014 11:57:30 GMT -5
Sewer Update Notice From Manager:
Date: 07/11/2014 Seq: 1
ATTENTION RESIDENTS!
LMK PIPE RENEWAL UPDATE AS OF JULY 11 ON S-bag TRAIL:
July 7: 14, 41, 51, 70
July 8: 37, 58, 62 COMPLETED
July 9: 29, 38, 42, 33 COMPLETED
July 10: 21, 24, 27, 30 COMPLETED
July 11: 15, 19, 22, 26
LMK has more materials on order which will be in next week. They have S-bag Trail and continued repairs scheduled for July 21 and July 28. We will update the scheduled affected areas and provide owners with the information as it comes available.
If you plan to be in residence on those days, please turn your water off at the meter while repairs are being performed.
We appreciate your cooperation during this project.
|
|
|
Post by Dick Tracy on Jul 24, 2014 18:20:48 GMT -5
How is the sewer lateral project coming along? Have they had to dig up any asphalt yet? I would guess the water table is high at this time of year. That was an excuse that was used before, water table to high, will have to wait until Fall/Winter to do repairs. These repairs maybe at a different depth. Just Curious...
|
|